X

We use our own and third-party cookies to give you an improved browsing experience and to compile anonymous browsing statistics.

By continuing to browse our site, it is understood that you accept our use of cookies. You can change your settings at any time or open our Cookies Policy to learn more.

Torresol Energy - Reinventing Solar Power
Idioma / Language:   Castellano   English
       Search
 Gemasolar:

Gemasolar is the first commercial-scale plant in the world to apply central tower receiver and molten salt heat storage technology. The relevance of this plant lies in its technological uniqueness, since it opens up the way for new thermosolar electrical generation technology.

Characteristics of Gemasolar:

  • Rated electrical power: 19.9 MW
  • Net electrical production expected: 110 GWh/year
  • Solar field: 2,650 heliostats on 185 hectares
  • Heat storage system: the molten salt storage tank permits independent electrical generation for up to 15 hours without any solar feed.

The prolongation of the plant's operating time in the absence of solar radiation and the improvement in efficiency of the use of the heat from the sun makes Gemasolar's output much higher than that which is delivered by other technologies in a facility with the same power.

The notable increase in the plant's power efficiency guarantees electrical production for 6,500 hours a year, 1.5 to 3 times more than other renewable energies. The plant will thus supply clean, safe power to 25,000 homes and reduce atmospheric CO2 emissions by more than 30,000 tons a year.

The power generated by Gemasolar will be sent through a high-tension line to the substation of Villanueva del Rey (Andalusia, Spain), where it will be injected into the grid.

Central tower technology:

 

The inclusion of a novel molten-salt heat storage system permits the production of electricity in the absence of solar radiation.

The heat collected by the salts (capable of reaching temperatures above 500º) generates steam and produces electrical power. The surplus heat accumulated during sun hours is stored in the molten-salt tank.

In this way, Gemasolar can produce electrical power 24 hours a day for many months of the year.

Related image: (Click here to watch the enlarged image

gemasolar    gemasolar    gemasolar    gemasolar    gemasolar
 Project information:
Location:
Fuentes de Andalucía (Seville, Spain)

Property:
Gemasolar 2006 SAU

Technology:
Central tower receiver, heliostat field and molten salt heat storage system

Description:

First commercial-scale plant in the world to apply central tower receiver and molten salt heat storage technology.



 Planta Gemasolar:

Address:
Obra Gemasolar
Gemasolar work
A4 p.k. 475
41420 Fuentes de Andalucía
Seville - Spain

Telephone: (+34) 955 90 61 21

[+ Info]
 Related documents:
Copyright © 2010 Torresol Energy Investments, S.A.      Site Map - Legal - Links - Accesibility
Masdar     Sener

Cookies policy

What are cookies?

A "cookie" is a small file with browsing information that is downloaded to the user's computer, tablet or smartphone.

The combined total of cookies from all of our users helps us to improve the quality of our website, letting us identify which pages are useful and which might need to be improved.

There is no way in which cookies can cause damage to your device. On the contrary, their use helps us to identify and solve errors.

What type of cookies does this website use?

Below are details of the types of cookies that are used in the sener.es website and their specific purposes:

Different sources:

Different lifespans:

Different purposes:

How do I delete cookies?

You can allow, block or delete cookies installed on your device by changing the settings of the browser installed on your device:

User's responsibilities:

By using this Website, the User expressly agrees to the use of information that is collected; the User also acknowledges awareness of the possibility to refuse the processing of such data or information by blocking Cookies in their browser settings. However, the option of blocking Cookies from the browser may inhibit full use of all of the Website's functions.

After reading all of the information provided, we inform the User that by continuing to browse our website without taking the appropriate measures to change the browser settings to block the installation of Cookies used by the website, under the terms included in article 22.2 of Law 34/2002 on Information Society Services and E-Commerce, in accordance with its drafting by RD 13/2012, of 30 March, the User contents to the use of the mechanisms referred to herein.

X