 Gemasolar:

Gemasolar is the first commercial-scale plant in the world to apply central tower receiver and molten salt heat storage technology. The relevance of this plant lies in its technological uniqueness, since it opens up the way for new thermosolar electrical generation technology.

Characteristics of Gemasolar:

  • Rated electrical power: 19.9 MW
  • Net electrical production expected: 110 GWh/year
  • Solar field: 2,650 heliostats on 185 hectares
  • Heat storage system: the molten salt storage tank permits independent electrical generation for up to 15 hours without any solar feed.

The prolongation of the plant's operating time in the absence of solar radiation and the improvement in efficiency of the use of the heat from the sun makes Gemasolar's output much higher than that which is delivered by other technologies in a facility with the same power.

The notable increase in the plant's power efficiency guarantees electrical production for 6,500 hours a year, 1.5 to 3 times more than other renewable energies. The plant will thus supply clean, safe power to 25,000 homes and reduce atmospheric CO2 emissions by more than 30,000 tons a year.

The power generated by Gemasolar will be sent through a high-tension line to the substation of Villanueva del Rey (Andalusia, Spain), where it will be injected into the grid.

Central tower technology:

 

The inclusion of a novel molten-salt heat storage system permits the production of electricity in the absence of solar radiation.

The heat collected by the salts (capable of reaching temperatures above 500º) generates steam and produces electrical power. The surplus heat accumulated during sun hours is stored in the molten-salt tank.

In this way, Gemasolar can produce electrical power 24 hours a day for many months of the year.

Related image: (Click here to watch the enlarged image

gemasolar    gemasolar    gemasolar    gemasolar    gemasolar
 Project information:
Location:
Fuentes de Andalucía (Seville, Spain)

Property:
Gemasolar 2006 SAU

Technology:
Central tower receiver, heliostat field and molten salt heat storage system

Description:

First commercial-scale plant in the world to apply central tower receiver and molten salt heat storage technology.



 Planta Gemasolar:

Address:
Obra Gemasolar
Gemasolar work
A4 p.k. 475
41420 Fuentes de Andalucía
Seville - Spain

Telephone: (+34) 955 90 61 21

[+ Info]
 Related documents:
Copyright © 2010 Torresol Energy Investments, S.A.      Site Map - Legal - Links - Accesibility
Masdar     Sener

Cookies policy

The SENER INGENIERÍA Y SISTEMAS, S.A. Web Site service provider uses cookies only to make it easier for the User to surf the Web Site and to obtain statistical data. In no event will they be used to gather personal data. They are only used to improve Web Site surfing and reduce downloading time of Web elements. Nevertheless, if the User does not want to use these cookies, they can rescind the use of system cookies from their Web browser options. These files can also be deleted without affecting the quality of the Web Site, and the only effect of this configuration is that the Web Site takes longer to download, as the files are not in the User’s cache memory.

X